Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer

Introduction

We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.

This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.

  1. Gather materials for Mod. 8a+b 6: 2x4x12' 2: 1/2"x4'x8' Plywood
    • Gather materials for Mod. 8a+b

    • 6: 2x4x12'

    • 2: 1/2"x4'x8' Plywood

    • 2: 3/4"x4'x8' OSB

    • ~100: 3-1/8" construction screw

    • ~100: 1-5/8" coated deck screw

  2. Cut all framing members for Module 8a Use two people to make the proper cuts according to the dimensions in the images.
    • Cut all framing members for Module 8a

    • Use two people to make the proper cuts according to the dimensions in the images.

    • Simultaneously, use the other two people in your group to assemble the framing pieces using two 3-1/8" construction screws per connection, screwing perpendicular to the bottom plate and top plate.

Workshop One

Member since: 4/19/14

4 Reputation

6 Guides authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 9

All Time: 144