Introduction
We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.
-
-
Gather materials for Mod. 8a+b
-
6: 2x4x12'
-
2: 1/2"x4'x8' Plywood
-
2: 3/4"x4'x8' OSB
-
~100: 3-1/8" construction screw
-
~100: 1-5/8" coated deck screw
-