Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer

Introduction

We are going to break down the framing into 3 framing modules that will be assembled on the ground in parallel with other construction processes.

This is the how-to for the first modules of the 1st floor. Starting from the south, they are labeled 1-10 with an "a" and "b" distinction referencing their location on either west or east respectively.

  1. Gather Material for Mod. 3a Gather Material for Mod. 3a
    • Gather Material for Mod. 3a

Workshop One

Member since: 4/19/14

4 Reputation

6 Guides authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 0

Past 30 Days: 5

All Time: 144