Introduction
We are going to break down the framing into 3 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the first modules of the 1st floor. Starting from the south, they are labeled 1-10 with an "a" and "b" distinction referencing their location on either west or east respectively.
-
-
Gather materials for Mod. 1a
-
4:2x4x6'
-
1/2 sheet of 3/4"x4'x8' OSB (other 1/2 will be used for Mod. 1b)
-
1/2 sheet of 1/2"x4'x8' plywood (other 1/2 will be used for Mod. 1b)
-
16: 3-1/8" construction screw
-
32: 1-5/8" coated deck screw
-
-
-
Use two people to make the proper cuts at the dimensions in the graphic at a 17 degree angle
-
Simultaneously, use the other two people in your group to assemble the framing pieces using two 3-1/8" construction screws per connection, screwing perpendicular to the bottom plate and top diagonal pieces.
-