Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer
    • Clear vegetation from the site. We used the OSE pulverizer on the Life Trac 6.

    • You can strip off the topsoil, as well, or otherwise change the grade at this point. In our case, we had little topsoil and we liked the way the grade worked out by raising the building up on the gravel.

Chris Reinhart

Member since: 10/29/13

2,211 Reputation

18 Guides authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 4

Past 30 Days: 9

All Time: 515