Clear vegetation from the site. We used the OSE pulverizer on the Life Trac 6.
-
You can strip off the topsoil, as well, or otherwise change the grade at this point. In our case, we had little topsoil and we liked the way the grade worked out by raising the building up on the gravel.
-
Cut down vegetation in a wide area around your building site, as well. 20' beyond where the gravel will be should be adequate. You will need room for the brick press and rollers, and to stage other materials, too. You will also need room for people to move around and work.
-
-
-
Check levelness and squareness of foundation. Use a level to make certain that the foundation is not tilted. Measure the diagonals of the foundation frame and makes adjustments to ensure squareness.
-
Once foundation is level and square, drive stakes into inner corners to keep the foundation in place. We used pieces of 1/2" rebar for this, because we had lots on hand. You could also use wooden stakes.
-
Almost done!
Finish Line