Skip to main content
Editing Step 8 —

Step Type:

Drag to rearrange

Once you have completed the frame and added the bathroom side sheathing, flip the utility module over so that you have access to the inside.

The next step is to add the drain and vent (DWV) plumbing, contained in the next guide.