Skip to main content
/

Site Navigation

Your Account

Choose Language

Help
Editing Step 5 —

Step Type:

Drag to rearrange

Grind off the welds for the back and side pieces so that the entire drawer is flush.

Flip the drawer over and tack the sides from the top.

Place the roof and inner rails in their respective places. See Diagram.

Insure inner rails are perfectly parallel (varying no more than a 16th of an inch) and square throughout the entire length.

Tack them in multiple places except where they are touching the table.