Place the frame/osb/insulation assembly osb-side down. Align the plywood sheathing with a 5" overhang on the right (edge furthest from narrow stud-gap) and flush with the bottom plate. The offset should line the left edge to sit flush with the 2nd stud from left-most. The top overhang should be 1.5".