Changes to Step #8
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| + | [* black] Once you have completed the frame and added the bathroom side sheathing, flip the utility module over so that you have access to the inside. |
|---|---|
| + | [* black] The next step is to add the drain and vent (DWV) plumbing, contained in the next guide. |
Image 1
No previous image
Added