Changes to Step #6
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| + | [* black] Before screwing down the sheathing, double-check to make sure that frame is square by measuring the diagonals. |
|---|---|
| + | [* black] Once the diagonals measure the same, screw on the sheathing. Then, check the diagonal measurements one more time to make sure that the frame did not shift while you were screwing on the sheathing. |
Image 1
No previous image
Added