Changes to Step #2
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| [* black] This image shows the frame and lists the materials counts to construct the frame, including the sheathing material. | |
| + | [* black] ***Note that the image shows a duplicate entry for number number of 2x6s needed. The number needed is 7.*** |