Changes to Step #12
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| [* black] Pour the concrete into the forms. Then, place your caps for the door recesses into place and level the top of the concrete using a board to screed off the excess. | |
| [* black] The image shows what you will have created once the concrete is poured into the forms. | |
| [* black] You may have chosen to place additional stub-outs of rebar as shown in the second image or in other places. If you do, the holes for these pieces of rebar will be located like the other stub-outs: 4" apart from each other and 4" in from each edge of the foundation formwork. | |
| + | [* black] ***NOTE: For our build, we'll be using stub-outs from the north-east corner only.*** |