Changes to Step #6
Edit by Dan Benamy —
Edit approved by Dan Benamy
- Before
- After
- Unchanged
Step Lines
- | [* black] Add the tube on which you will rest metal that's being fed to the shears: Bolt 2 6"x1" bolts though washers, through holes 2 and 5 of a 6 hole tube, and into a 4 hole tube. Put the nuts on the inside of the 4 hole tube. |
---|---|
+ | [* black] Parts: |
+ | [* black] 1 4 hole, 0.25" tube |
+ | [* black] 2 1" x 6" bolts |
+ | [* black] 2 1" washers |
+ | [* black] 2 1" nuts |
+ | [* black] Put the bolts though washers, holes 2 and 5 of the 6 hole tube that's not touching the springs, and into the end holes of the 4 hole tube. Put the nuts on the inside of the 4 hole tube. |
+ | [* black] TODO pic of bolts going in |