Changes to Step #3
Edit by Dan Benamy —
Edit approved by Dan Benamy
- Before
- After
- Unchanged
Step Lines
| - | [* black] Put a 6 hole tube which will be the working clamp onto the upright bolts. Put washers and nuts on the bits of bolts sticking through this tube. |
|---|---|
| + | [* black] Parts: |
| + | [* black] 1 6 hole, 0.25" tube |
| + | [* black] 2 1" washers |
| + | [* black] 2 1" nuts |
| + | [* black] Put the tube onto the upright bolts. Put washers and nuts on the bits of bolts sticking through this tube. This'll be the working clamp |
| [* black] The springs should push the tube up against the top nuts but you should be able to push the tube down an inch or so. |