Changes to Step #3
Edit by Dan Benamy —
Edit approved by Dan Benamy
- Before
- After
- Unchanged
Step Lines
- | [* black] Put a 6 hole tube which will be the working clamp onto the upright bolts. Put nuts on the bits of bolts sticking through this tube. |
---|---|
+ | [* black] Put a 6 hole tube which will be the working clamp onto the upright bolts. Put washers and nuts on the bits of bolts sticking through this tube. |
[* black] The springs should push the tube up against the top nuts but you should be able to push the tube down an inch or so. |
Image 1
No previous image
Added
Image 2
No previous image
Added