Changes to Step #5
Edit by Dan Benamy —
Edit approved by Dan Benamy
- Before
- After
- Unchanged
Step Lines
- | [* black] Put 2 TODO"x1" threaded rod through washers and through the holes on either side of the lower blade plate, from the side with the upper blade. |
---|---|
- | [* black] Put washers over those bolts on both sides. |
- | [* black] Put a nut on the end of the bolt sticking out of the side of the ironworker with the top blade. |
- | [* black] TODO move/merge to assembly pieces guide: Put 2 TODO"x1" bolts through washers and through the holes on either side of the lower blade plate, from the side with the upper blade. |
+ | [* black] Parts: |
+ | [* black] 1 6 hole, 0.25" tube |
+ | [* black] 2 1" x TODO" threaded rod |
+ | [* black] 6 1" washers |
+ | [* black] 2 1" nuts |
+ | [* black] Put each threaded rod through a washer, the end holes of the 6 hole tube, and the 2 1 hole tubes. |
+ | [* black] Put 2 washers on each bolt after everything else. The washers will give the table clamp room to move up and down without rubbing against the frame. |