Changes to Step #36
Edit by Robert Kirk —
Edit approved by Robert Kirk
- Before
- After
- Unchanged
Step Lines
+ | [* 1] Move tractor to the backhoe and put the upper quick attach finger weldment into place on both the right and left-hand sides Of the quick attach and tack into place |
---|---|
+ | [* 1] Add triangular support to side of finger for strength |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added