Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #1

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged

Step Lines

[title] Clamp the Vertical Pieces
[* black] Gather materials for the “Jig”; this means 6”x12” tubing (52”) and any extra heavy U Channel. If you don't have any laying around, you can use one drawer member, and one spacer on each side.
[* black] Clamp the vertical pieces to the "Jig" on each end, with extra U channel in between the tubing and the vertical pieces.
[* black] Make sure they are both orientated properly, that is that both roller slots are at the same end of the jig.
[* black] Insure the two verticals are flush at the top end.

Image 1

No previous image

Added