Changes to Step #4
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
Step Lines
| + | [title] Prepare the vertical members. |
|---|---|
| + | [* black] Punch the holes as shown. The diameters are 3/4". |
| + | [* black] Torch the roller slots as shown. |
| + | [* black] Insure a 1/2" bolt goes thru it. |
| + | [* black] Grind away the slag. |
| + | [* black] Weld the the thin cylinder support nuts, taking care to protect the threads. |
Image 1
No previous image
Added
Image 2
No previous image
Added