Changes to Step #1
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
Step Lines
| + | [title] Make the sensor holders |
|---|---|
| + | [* black] One is for the main frame, and one goes in the primary arms. |
| + | [* black] Weld the rebar to the threaded rod at a right angle. |
| + | [* black] Protect the threads on the threaded rod by welding. (A small pipe works well) |
| + | [* black] Thread a nut onto it. |
Image 1
No previous image
Added
Image 2
No previous image
Added