Changes to Step #1
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
Step Lines
| + | [title] Grind the bolts |
|---|---|
| + | [* black] Grind off the top of the 12mm bolts so that the head is 1/4” thick or less. |
| + | [* black] This is so that the bolts will not be touching the drawer as it slides in and out. |