Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #5

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged

Step Lines

[title] Tack Roof, Inner Rails
[* black] Grind off the welds for the back and side pieces so that the entire drawer is flush.
[* black] Flip the drawer over and tack the sides from the top.
[* black] Place the roof and inner rails in their respective places. See Diagram.
[* icon_caution] Insure inner rails are perfectly parallel (varying no more than a 16th of an inch) and square throughout the entire length.
[* black] Tack them in multiple places except where they are touching the table.

Image 1

No previous image

Added

Image 2

No previous image

Added

Image 3

No previous image

Added