Changes to Step #2
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
Step Lines
| + | [* black] Lay one support on the table, with the grate mount slot touching the table. |
|---|---|
| + | [* black] Get the Shaker Mount and tighten 3/4" bolts with nuts to the Soil Shaker so the bolt head is where the hammer will be. |
| + | [* black] Prop this up on the hopper support, so the first bolt is about 2" above the 28" hole and both bolts are touching the support. |
| + | [* black] Mark which side of the shaker you are welding the bolts for. |
Image 1
No previous image
Added
Image 2
No previous image
Added
Image 3
No previous image
Added