Skip to main content

Changes to Step #2

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged

Step Lines

+[* black] Lay one support on the table, with the grate mount slot touching the table.
+[* black] Get the Shaker Mount and tighten 3/4" bolts with nuts to the Soil Shaker so the bolt head is where the hammer will be.
+[* black] Prop this up on the hopper support, so the first bolt is about 2" above the 28" hole and both bolts are touching the support.
+[* black] Mark which side of the shaker you are welding the bolts for.

Image 1

No previous image

Added

Image 2

No previous image

Added

Image 3

No previous image

Added