Changes to Step #3
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| + | [* black] Attach the 4' wide sheet(s) first. |
|---|---|
| + | [* black] Three edges will be flush with the exterior of the frame. |
| + | [* black] ***One edge will break halfway on a joist. This is essential to have an attachment surface for the next sheet(s).*** |
Image 1
No previous image
Added