Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #3

Edit by Chris Reinhart

Edit approved by Chris Reinhart

Before
After
Unchanged

Step Lines

[* black] Layout your pieces on a flat surface like a concrete slab or wooden floor deck. It helps a lot if this surface is completely level.
[* black] Lay your two longer pieces with the layout marks on them facing each other and lay your 6 shorter pieces in between, roughly in the position of the marks.
-[* black] ***Pre-drill two holes from the outside*** as shown on the second photo of this step. Screw (or nail, if you choose) the pieces into position.
+[* black] ***Pre-drill two holes from the outside at the ends of the board to avoid splitting*** as shown on the second photo of this step. (The pre-drilling is only necessary at the ends of the board, not in the middle.) Screw (or nail, if you choose) the pieces into position.