Changes to Step #3
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| [* black] Layout your pieces on a flat surface like a concrete slab or wooden floor deck. It helps a lot if this surface is completely level. | |
| [* black] Lay your two longer pieces with the layout marks on them facing each other and lay your 6 shorter pieces in between, roughly in the position of the marks. | |
| - | [* black] ***Pre-drill two holes from the outside*** as shown on the second photo of this step. Screw (or nail, if you choose) the pieces into position. |
| + | [* black] ***Pre-drill two holes from the outside at the ends of the board to avoid splitting*** as shown on the second photo of this step. (The pre-drilling is only necessary at the ends of the board, not in the middle.) Screw (or nail, if you choose) the pieces into position. |