Changes to Step #3
Edit by Chris Reinhart —
Edit approved by Chris Reinhart
- Before
- After
- Unchanged
Step Lines
| + | [* black] Layout your pieces on a flat surface like a concrete slab or wooden floor deck. It helps a lot if these surface is completely level. |
|---|---|
| + | [* black] Lay your two longer pieces with the layout marks on them facing each other and lay your 6 shorter pieces in between, roughly in the position of the marks. |
| + | [* black] Screw (or nail, if you choose) the pieces into position from the outside, as seen in the second photo for this step. |
Image 1
No previous image
Added
Image 2
No previous image
Added