- | [* black] Tack sidewall P4 into place at 90 degrees. |
---|---|
- | [* black] Hold sidewall (P5) into place, and then stick Shaft 21 through the bearings to ensure proper alignment of side walls. Tack sidewall (P4). Now tighten the bolts, ensuring the shaft is aligned correctly. |
- | [* black] Finish welding the seams for the back plate, bottom sheet and sidewalls (P1, P3, P4, P5). Weld in the 1" nuts on the inside side of the sidewalls |
+ | [* black] Tack P45 fill plate in at 45 degrees and finish the welds. |
+ | [* black] Loosely fit both bearings with bolts and thread the shaft in. ensure it rotates freely. Now tighten the bolts, ensuring the shaft is aligned correctly. |