Changes to Step #6
Edit by Robert Kirk —
Edit approved by Robert Kirk
- Before
- After
- Unchanged
Step Lines
| + | [* black] INSTALL THE Z SWITCH (continued) |
|---|---|
| + | [* black] Route wires through relief #6 and plug in as shown. |
| + | [* black] Plug in as shown |
Image 1
No previous image
Added
Image 2
No previous image
Added