Changes to How to build and install the Backhoe Pivot Introduction
Edit by Robert Kirk —
Edit approved by Robert Kirk
- Before
- After
- Unchanged
| Type |
|
|||||||||||||
| Thing |
|
|||||||||||||
| Title |
|
|||||||||||||
| Introduction |
|
|||||||||||||
| Time Required Min |
5 hours
12 hours
|
|||||||||||||
| Time Required Max |
6 hours
12 hours
|
|||||||||||||
| Summary |
|
Tools
- MIG welder x1 added.
- Oxy-Acetylene Torch x1 added.
- Standard hand tools x1 added.