Changes to CEB Shaker Mount Introduction
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
Parts
- 4"x4"x1/2" Angle Steel 8" x1 Motor attachment added.
- 4"x4"x1/2" Angle Steel 21" x1 Hopper Attachment added.
- 2"x2"x1/4" Angle Steel 16" x2 Guard top and bottom added.
- 2"x2"x1/4" Angle Steel 10" x2 Guard sides added.
- 1" rebar 7" x2 Braces added.
- 1/8" Sheet Steel 10"x19" x1 guard added.
- 4"x4"x1/2" Angle Steel x1 removed.
- 2"x2"x1/4" Angle Steel x1 removed.
- 1" rebar x1 removed.
- 1/8" Sheet Steel x1 removed.