Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Module 6a+b Introduction

Edit by chuytoscano

Edit approved by chuytoscano

Before
After
Unchanged
Category
MicroHouse 3 Walls
Type
how-to
Title
Module 6a+b
Introduction
We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.
Time Required Min
1 minute
Time Required Max
1 minute
Imageid
Before
After
Difficulty
Moderate
Author
Public
No
Summary
This guide will explain how to construct the 2x4 modules of the walls that sit atop the masonry and provide the 17 degree slope of the roof.

Flags

  • In Progress added.
  • User-Contributed Guide added.

Steps

Step #: 1
Before
After
Step #: 2
Before
After
Step #: 3
Before
After
Step #: 4
Before
After
Step #: 5
Before
After
Step #: 6
Before
After