Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to CEB Leg Holders Introduction

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged
Category
CEB Press
Type
installation
Title
CEB Leg Holders
Introduction
We suggest you prepare all leg holders at once, doing each step for all leg holders before moving on.
Time Required Min
30 minutes
Time Required Max
30 minutes
Imageid
Before
After
Difficulty
Moderate
Author
Public
Yes
Summary
Make versatile leg holders compatible with many Open Source Ecology machines.

Tools

  • torch x1 added.
  • Welder x1 added.

Parts

  • Steel tubing x1 added.
  • Nut x1 added.
  • Bolt x1 added.

Flags

  • User-Contributed Guide added.