Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Module 1a+b Introduction

Edit by Workshop One

Edit approved by Workshop One

Before
After
Unchanged
Title
MicroHouse 3 Walls
Module 1a+b
Introduction
We are going to break down the framing into 311 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the first 3 modules of the 1st floor. Starting from the south, they are labeled 1-3 with an "a" and "b" distinction referencing their location on either west or east respectively.
Public
No
Yes

Steps

Step #: 1
Before
After
Step #: 2
Before
After
Step #: 3
Before
After
Step #: 4
Before
After
Step #: 5
Before
After
Step #: 6
Before
After