Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Building the MH 2 Floor Modules Introduction

Edit by Catarina Mota

Edit approved by Catarina Mota

Before
After
Unchanged
Thing
Part 1 -: MicroHouse 2 Floor Frames

Tools

  • Circular Saw x1 added.
  • Tape Measure x1 added.
  • Speed Square x1 added.
  • Cordless Drill / Driver x1 added.

Parts

  • 2X6, 6' long x32 added.
  • 3" screws x100 added.