Changes to Soil Loading System Introduction

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged
Category
CEB Press
Type
installation
Title
Soil Loading System
Introduction
You must have finished assembling the main frame before you install the soil loading system.
Time Required Min
2 hours
Time Required Max
2 hours
Imageid
Before
After
Difficulty
Moderate
Author
Public
Yes
Summary
This guide covers the installation of the hopper, shaker, and grate to the assembled main frame.

Tools

  • Angle grinder x1 added.
  • c clamps x1 added.
  • Spray paint x1 added.
  • torch x1 added.
  • various wrenches x1 added.
  • Vise clamps x1 added.
  • Welder x1 added.

Parts

  • 3/4" galvanized nuts x1 added.
  • 1/2" lock nuts x1 added.
  • 1/2" nuts x1 added.
  • 3/4"x1.5" bolts x1 added.
  • 3/4"x2.5" bolts x1 added.
  • 1/2"x2.5" bolts x1 added.
  • 1/2"x3" bolt x1 added.
  • 1/2" washers x1 added.
  • 3/4" washers x6 4 for grate to hopper supports, 2 for grate to grate supports added.
  • 1/2"x1" Bolts x1 added.

Flags

  • User-Contributed Guide added.