Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Soil Loading System Introduction

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged
Category
[ … ]CEB Press
Type
[ … ]installation
Title
[ … ]Soil Loading System
Introduction
[ … ]You must have finished assembling the main frame before you install the soil loading system.
Time Required Min
2 hours
Time Required Max
2 hours
Imageid
Before
After
Difficulty
Moderate
Author
Public
Yes
Summary
[ … ]This guide covers the installation of the hopper, shaker, and grate to the assembled main frame.

Tools

  • Angle grinder x1 added.
  • c clamps x1 added.
  • Spray paint x1 added.
  • torch x1 added.
  • various wrenches x1 added.
  • Vise clamps x1 added.
  • Welder x1 added.

Parts

  • 3/4" galvanized nuts x1 added.
  • 1/2" lock nuts x1 added.
  • 1/2" nuts x1 added.
  • 3/4"x1.5" bolts x1 added.
  • 3/4"x2.5" bolts x1 added.
  • 1/2"x2.5" bolts x1 added.
  • 1/2"x3" bolt x1 added.
  • 1/2" washers x1 added.
  • 3/4" washers x6 4 for grate to hopper supports, 2 for grate to grate supports added.
  • 1/2"x1" Bolts x1 added.

Flags

  • User-Contributed Guide added.