Changes to CEB Press: Structural Components Assembly Introduction
Edit by Dozuki System —
Edit approved by Dozuki System
- Before
- After
- Unchanged
| Category |
|
|
| Type |
|
|
| Title |
|
|
| Time Required Min |
2 hours
|
|
| Time Required Max |
2 hours
|
|
| Imageid |
Before
After
|
|
| Difficulty |
Moderate
|
|
| Author | ||
| Public |
Yes
|
|
| Summary |
|
Tools
- Angle grinder x1 added.
- C-Clamps x1 added.
- MIG welder x1 added.
- Socket set and ratchet, or various wrenches x1 added.
- torch x1 added.
- Vise clamps x1 added.
Parts
- 3/4"x1.5" bolt x1 added.
- 3/4" nuts x1 added.
- 3/4" washers x1 added.
Flags
- User-Contributed Guide added.