Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to CEB Press: Structural Components Assembly Introduction

Edit by Dozuki System

Edit approved by Dozuki System

Before
After
Unchanged
Category
[ … ]CEB Press
Type
[ … ]installation
Title
[ … ]CEB Press: Structural Components Assembly
Time Required Min
2 hours
Time Required Max
2 hours
Imageid
Before
After
Difficulty
Moderate
Author
Public
Yes
Summary
[ … ]This guide explains how to install the primary and secondary arms, the feet, the legs, the brick-holder plate, and the dirt-keeper plate to the main frame. This is to be done after you have finished all of the steps in the fabrication section on the wiki.

Tools

  • Angle grinder x1 added.
  • C-Clamps x1 added.
  • MIG welder x1 added.
  • Socket set and ratchet, or various wrenches x1 added.
  • torch x1 added.
  • Vise clamps x1 added.

Parts

  • 3/4"x1.5" bolt x1 added.
  • 3/4" nuts x1 added.
  • 3/4" washers x1 added.

Flags

  • User-Contributed Guide added.

Steps

Step #: 1
Before
After
Step #: 2
Before
After
Step #: 3
Before
After
Step #: 4
Before
After
Step #: 5
Before
After
Step #: 6
Before
After