Introduction
We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.
-
-
Gather materials for mod 9a&b (these are enough materials for BOTH walls)
-
8:2x4x8
-
2:2x4x10
-
2 sheets of 3/4"x4'x8' OSB for exterior sheathing
-
2 sheets of 1/2"x4'x8' plywood for interior sheathing
-
~buncha 3-1/8" construction screws
-
~buncha 1-5/8" coated deck screws
-