Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer

Introduction

We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.

This is the how-to for the modules of the 1st floor. Starting from the south, they are labeled 1-3 with an "a" and "b" distinction referencing their location on either west or east respectively.

Eric Powell

Member since: 8/7/14

1 Reputation

1 Guide authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 1

Past 30 Days: 6

All Time: 167