Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer

Introduction

We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.

This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.

  1. Gather materials for Mod. 7a+b 4:2x4x6' 2:2x4x8'
    • Gather materials for Mod. 7a+b

    • 4:2x4x6'

    • 2:2x4x8'

    • 2:2x4x10'

    • 2:1/2"x4'x8' Plywood

    • 2:3/4"x4'x8' OSB

    • ~50: 3-1/8" construction screw

    • ~50: 1-5/8" coated deck screw

  2. Cut all framing members for Module 7a Use two people to make the proper cuts at the dimensions in the graphics at a 17 degree angle on the miter saw.
    • Cut all framing members for Module 7a

    • Use two people to make the proper cuts at the dimensions in the graphics at a 17 degree angle on the miter saw.

    • Simultaneously, use the other two people in your group to assemble the framing pieces using two 3-1/8" construction screws per connection, screwing perpendicular to the bottom plate and top diagonal pieces.

  3. Cut Framing Members for Module 7b Use two people to make the proper cuts at the dimensions in the graphics.  Start by cutting elements for the window frame and the bottom plate, which are all square cuts (note there are two 2x4x2'9" members on edge at the top of the window box). Cut the remaining vertical elements and top plate according to the dimensions in the graphic at a 17 degree angle on the miter saw.
    • Cut Framing Members for Module 7b

    • Use two people to make the proper cuts at the dimensions in the graphics. Start by cutting elements for the window frame and the bottom plate, which are all square cuts (note there are two 2x4x2'9" members on edge at the top of the window box).

    • Cut the remaining vertical elements and top plate according to the dimensions in the graphic at a 17 degree angle on the miter saw.

    • Simultaneously, use the other two people in your group to assemble the framing pieces using two 3-1/8" construction screws per connection, screwing perpendicular to the bottom plate and top diagonal pieces.

    • Place the top two members of the window frame on edge flush with the outer faces of the vertical 2x4s. This will create a gap of approximately 1/2" between the two top pieces.

chuytoscano

Member since: 8/7/14

1 Reputation

2 Guides authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 1

Past 30 Days: 4

All Time: 159