Introduction
We are going to break down the framing into 11 framing modules that will be assembled on the ground in parallel with other construction processes.
This is the how-to for the modules of the 2nd floor. Starting from the south, they are labeled 4-9 with an "a" and "b" distinction referencing their location on either west or east respectively.
-
-
Gather materials for Mod. 5a+b
-
2: 2x4x8'
-
2: 2x4x10'
-
1: 1/2"x4x8 Plywood
-
1: 3/4"x4x8 OSB
-
~16: 3-1/8" construction screw
-
~16: 1-5/8" coated deck screw
-
-
-