Skip to main content

You're viewing a previously published revision of this guide.  View latest revision

Older Newer
  1. Place your first two bricks on each corner.
    • Place your first two bricks on each corner.

    • NOTE: The image does not show the sill seal foam gasket. In MH 2, we will be using a sill seal gasket between the foundation and the CEBs.

  2. ABSOLUTELY CRITICAL QUALITY CONTROL: Measure the diagonals between outside corners of the CEBs. The measurement should be 19' - 9 1/2". For quality control, you can be no more than 1/4" off from this measurement.
    • ABSOLUTELY CRITICAL QUALITY CONTROL: Measure the diagonals between outside corners of the CEBs. The measurement should be 19' - 9 1/2". For quality control, you can be no more than 1/4" off from this measurement.

    • As you start each course, you will measure both diagonal, as shown in Image 1. You will also measure the outside-to-outside length of the straight sides, as shown in Image 2.

Chris Reinhart

Member since: 10/29/13

2,211 Reputation

18 Guides authored

View Statistics:

Past 24 Hours: 0

Past 7 Days: 1

Past 30 Days: 1

All Time: 260