Introduction
Additional Materials Required:* Soil Loading Drawer* Wide Cylinder Supports* 3/4"x2" Bolts (8)* 3/4" Galvanized Nuts (8)
Tools
Parts
No parts specified.
Video Overview
-
-
Attach the cylinder to a hydraulic pump or power cube and contract the cylinder at least 1".
-
Stand up the frame so the press feet are facing down.
-
Insert the Soil loading drawer on top of the horizontal members so that the press plate is facing the press feet.
-
If the drawer doesn't fit because of the spacers, you welded them too close. Grind off the tacks and tack them a little higher.
-
Position the drawer so that the press plate will be fully contacted by the press feet.
-
Bolt the drawer members on snugly.
-
-
-
Use the pump to expand the cylinder as much as possible. The pump will likely stall out.
-
If the pump stalls, turn it back on and expand it fully once more.
-
Expand at least 3 times.
-
Contract it, so you can weld the spacers in. Then detach from the pump.
-
-
-
Remove the drawer members.
-
Look where the spacers are near the drawer.
-
The spacers should be very close to the drawer (less than 1/32") See quality control video if you wonder why.
-
If they are too far, grind off the welds and re-tack them so they are lightly contacting the drawer. Yet again, make sure they are perfectly square with the verticals.
-