Parts:
-
1 14 hole 1/2" tube
-
3 19 hole 1/2" tube
-
Stack the three 19 hole tubes so that the ends line up.
-
Lay the fourth tube on top, two holes in from one end of the others.
-
-
-
Parts:
-
2 2 hole x 4 hole plates
-
8 7" x 1" bolts
-
8 1" nuts
-
Put the bolts through one plate, through the frame tubes, and through the other plate. Fasten the nuts loosely to finish.
-
If you're having trouble getting the bolts through, try putting a couple of washers under the bottom tube to lift it up a little bit.
-
-
-
Parts:
-
4 2 hole x 4 hole plates
-
6 8" x 1" bolts
-
6 1" nuts
-
Slide the bolts through two of the plates, the frame tubing, the remaining plates, and fasten the nuts.
-
Parts of the plates should stick out past the tubes as shown.
-
Leave them a little loose.
-
The pictures show a 7th nut welded on. You'll install that later so don't worry about it just yet.
-
-
-
Parts:
-
8 1" nuts
-
4 pivot plates (TODO link to guide on making them) (for the ironworker, it's very important that the plates be perfectly flat against each other. If there are any bumps, grind them down.)
-
Put two pivot plates on each sides of the frame tubes, over the 4 threaded rods, and fasten them with nuts. Leave the nuts very loose.
-
Cancel: I did not complete this guide.
One other person completed this guide.